PU foam insulation layer
Sprayed polyurethane foam bonds to the deck, forming a rigid, continuous heat barrier with no thermal bridges.
Our Combo System is a complete roof solution that layers PU foam heat insulation, a seamless waterproof membrane and a UV-resistant top coat into a single engineered build, so one application keeps water out and heat down.
Combo system: foam, membrane and protective top coatWe assess and quote at no cost, anywhere in the UAE.
Joint-free polyurea and PU with no laps to fail.
On completed works, backed in writing.
Approved systems with full data sheets.
A combo roof system solves the two problems every UAE roof faces at the same time. Sprayed PU foam bonds to the deck as a rigid thermal insulation layer that slows heat transfer into the building, cutting air-conditioning loads through the hottest months. Over it, a seamless waterproof membrane and a reflective UV top coat seal the roof against rain, humidity and thermal movement. Because the layers are applied one after another as a single system, there are no laps, no loose sheets and no gaps between the insulation and the waterproofing, which is exactly where conventional roof build-ups usually fail. The result is a roof that stays dry, runs cooler and lasts far longer than a standalone membrane.
Sprayed polyurethane foam bonds to the deck, forming a rigid, continuous heat barrier with no thermal bridges.
A jointless membrane over the foam seals the entire roof, including upstands, plinths and penetrations.
A UV-stable finish protects the system from sunlight and reflects heat away from the roof.
Parapets, drains, pipe penetrations and rooftop plant are coved and sealed as part of the system.
Spot these early and a small fix stays small. Book a free inspection before it spreads.
From a single villa to large government facilities, our combo roof waterproofing scales to any project.
Villas, apartments and townhouses across the UAE.
Offices, retail, malls and hotels.
Warehouses, factories and logistics facilities.
Schools, clinics and public-sector facilities.
We visit the site, diagnose the problem and assess the substrate at no cost.
Cleaning, crack and spall repair, and preparing the substrate.
A bonding primer is applied so the system adheres fully.
The chosen system is applied to the specified thickness by trained crews.
Film-thickness checks and a water or holiday test confirm a continuous barrier.
Clean site, a report, sign-off and your warranty certificate.
We build this system on Kanz Chemical materials registered with Dubai Municipality (DM), supplied with full technical (TDS) and safety (MSDS) data sheets for consultant and authority approval. Potable-water and Civil Defence suitability is confirmed where required, and every completed system is handed over with a warranty certificate of up to 10 years.
Sprayed PU foam insulation
Seamless polyurea membrane
Reflective UV top coat
Epoxy primer
Products are selected per project after inspection. Equivalent DM-approved systems are used where a specification requires.
No laps or seams to fail, removing the most common cause of leaks.
UV resistance, thermal-cycling tolerance and crack-bridging over 350%.
Manufacturer-backed systems with full technical and safety data sheets.
On completed works, with responsive after-sales support.
Measured film thickness and testing on every job, with no sub-contracting.
A free inspection and an itemised quote with no surprises.
Common questions we are asked about combo roof waterproofing in the UAE.
Based in Musaffah, Abu Dhabi, we deliver to every emirate. Open an emirate below to see the districts we serve.
Tell us the roof size and its current condition. We will inspect it free of charge and quote a complete combo build-up of PU foam, seamless membrane and UV top coat.
